It’s nearly Christmas but we are still working at the Station. The CCT tidy up continues and the end is now in sight – the floor is also in sight! In the shock van, the workbench is now clear of stores, an old timber cupboard has been dismantled for firewood and a steel cabinet has been moved to the metalwork shop (for refurbishment prior to redeployment). The metalwork shop has been ‘christened’ with quite a lot of small steel pieces de-rusted, de-bolted, straightened and prepared for painting. Weighbridge Teas have continued to support the Santa operations, working in the Learning Centre at Pickering serving hot drinks and mince pies. They are returning to Levisham for the 27th-29th December and will be selling their usual wares from the Weighbridge. We hope you all have a very Merry Christmas and a Happy New Year. We will be in residence all week, continuing the works and watching the trains come through.