North and South end sidings

The north end siding is to be used for the stabling of shuttle trains allowing the through services to pass without delay. The south end siding is to allow the camping coach to be extracted and sent to Pickering for repair and overhaul when required. This siding is accessed from the goods yard and the point work will be operated with hand levers. A NER stop block (not a full buffer stop) is to be fitted at the end of the siding as was seen at many country stations, including Levisham.

The north end siding, due to its proximity to the level crossing is connected directly to the signal box and new signals allow access into it. This additional signalling has been tied into the existing interlocking controls, track circuits and level crossing control equipment.

Latest News
Galleries
Kieran draws the vans off the turntable 20Nov18The new siding stock display at Levisham 20nov18Stephen, Michael and Dave turn the vans at Pickering 20Nov18Drivers view from D2207 alongside Levisham Dock 20Nov18
Wikipedia

Click above to see our Wiki Entry