21st, 22nd November 2020

It was white over with frost this morning, a keen one with the ground frozen solid.

Continuing from last weekend the same limited group has been back at the 14 mile post. The last of the roadway has been levelled and the spoil has been carefully dug off the top of the retaining wall. The turning point at Bridge 17 has been lengthened by a yard to make it more useable. The lowered roadway has been titivated; removing uneven spots, pot holes, and humps. This completes the roadway and spoil works here.

Scrub has been cut around Bridge 16 and towards Bridge 17. This has been burnt, along with timber and roots dug out of the roadway spoil – keeping us warm on a cold frosty day.

Leave a Reply

Latest News
Join Facebook
Wikipedia

Click above to see our Wiki Entry